ACR SAVES LOCAL HIGH SCHOOL MORE THAN $600K ON GYM FLOOR PROJECT
After a water main gave way, almost 7,000 gallons of water poured into Tremper High School’s gym, leaving the floor decimated.
CHALLENGES:
Pre-existing damage-multiple prior losses
Construction of the flooring system
The sheer size and scope at 29,000 sq/ft
Advice from an ill-informed subject matter expert
ACR's Mike Smolka, Eric Brophy and team got to work immediately, saving both the high school’s hardwood floor and more than $600K.
A Cost Comparison
TEAR-OUT & REPLACE:
Noise
Dust and disruption
Total loss of use: 4-5 Months
Replacement costs are high-$25PF
= ESTIMATED COST: $720,000
RESTORE & REPLACE:
Much less disruption
Maintain operational continuity
Total loss of use: 19 DAYS
= ESTIMATED COST: $120,000